PART REPORT - P7000123353
PART REPORT
PART DESCRIPTION
PART NUMBER: |
P7000123353 PIPE, SUPERDUPLEX, 1.900(48.260) IN(MM) NO-DWG |
DRAWING NO: |
NO-DWG |
REVISION: |
A OD X 0.20(5.080) IN(MM) WT, SCH80, DRAWING REV: NA |
ECN: |
7168632 SEAMLESS |
TYPE: |
N |
STATUS: |
RELEASED |
OWNERSHIP: |
RIO AE |
UOM: |
M |
WEIGHT: |
12 (5.4) LBS (KGS) |
DWG OWN: |
HOU AE |
|
|
PART DATA
PROD SPEC : |
|
QUALITY LVL: |
PSL 3 |
MATL CLASS: |
FF |
TEMP RANGE: |
−4F(−20C) TO 250F(121C) |
PR# : |
NA |
GR# : |
NA |
SRV CLASS: |
NA |
|
|
REVIEWED BY: |
Torres, Caio |
REVIEW DATE : |
21−FEB−2025 |
APPROVED BY: |
Mathias, Alexandre |
APPROVAL DATE: |
26−FEB−2025 |
REQUIREMENTS MATRIX: 7QM7010
REV: A |
OWNER: RIO COE |
STATUS: RELEASED |
RAW MATERIAL REQUIREMENTS − MILL PRODUCTS
(PIPE/TUBE/PLATE/MILL SHAPES); CRA DUPLEX, SUPERDUPLEX, NICKEL ALLOY, AND SUPER AUSTENITIC STAINLESS; BATCH MANAGED TRACEABILITY; UOM LENGTH OR WIDTH X THICKNESS
Q15003 |
CTQ LEVEL 3 |
NOTE1 |
DETAILED REQUIREMENTS FOR THE RAW MATERIAL ARE DESCRIBED WITHIN THE MATERIAL SPECIFICATION |
Q00167 |
SPECIAL HANDLING REQUIREMENTS FOR DUPLEX, AUSTENITIC AND NICKEL ALLOY MATERIALS |
Q03402 |
BATCH MANAGEMENT |
Q00498 |
VISUAL INSPECTION, MARKING AND PACKAGING OF PIPE & FITTING PRODUCTS |
Q00596 |
VISUAL EXAMINATION IN COMPLIANCE WITH PETROBRAS REQUIREMENTS |
REV: A |
OWNER: HOU COE |
STATUS: RELEASED |
POSITIVE MATERIAL IDENTIFICATION (PMI) WITH PETROBRAS REQUIREMENTS
Q01085 |
SPECIFICATION FOR POSITIVE MATERIAL IDENTIFICATION (PMI) WITH PETROBRAS REQUIREMENTS |
REV: A |
OWNER: RIO COE |
STATUS: RELEASED |
TECHNIPFMC AND CLIENT HOLD POINT − PRE-INSPECTION MEETING (PIM)
HOLD |
PRE-INSPECTION MEETING (PIM) SHALL BE HOLD POINT FOR (continued...) |
REQUIREMENTS MATRIX: 7QM7010 (Continued)
TECHNIPFMC AND CLIENT.
LST70041017 |
LIST, FORM, PROJECT DOCUMENTATION, EPCI PROJECTS |
NOI70055307 |
NOTIFICATION OF INTERVENTION (NOI), NOTIFICATION OF INTERVENTION (NOI), NOTIFICATION ADDRESS AND TIME PERIOD DETAILS FOR EPCI PROJECTS |
REV: C |
OWNER: RIO COE |
STATUS: RELEASED |
TECHNIPFMC AND PETROBRAS HOLD POINT − ITP APPROVAL
HOLD1 |
SUPPLIER SHALL SUBMIT ITP TO TECHNIPFMC APPROVAL 2 WEEKS AFTER ORDER. |
HOLD2 |
PROJECT QUALITY ENGINEER SHALL SUBMIT THE ITP TO PETROBRAS APPROVAL. |
Q00398 |
REQUIREMENTS FOR PROCESS TYPE MANUFACTURING PROCESS SPECIFICATION, (PROCESS MPS) |
NOTE |
THE PRODUCTION SHALL NOT START UNTIL APPROVAL OF ITP HAS BEEN RECEIVED FROM PETROBRAS |
REV: A |
OWNER: RIO COE |
STATUS: RELEASED |
ADDITIONAL SUPPLIER REQUIREMENTS FOR EPCI PROJECTS
LST70041017 |
LIST, FORM, PROJECT DOCUMENTATION, EPCI PROJECTS |
LST70066754 |
LIST, FORM, PROJECT DOCUMENTATION, CONTRACTUAL HSE GUIDELINE, EPCI PROJECTS |
LST70066836 |
LIST, FORM, PROJECT DOCUMENTATION, HANDLING LIFITING AND ROAD TRANSPORTATION, EPCI PROJECTS |
LST70066930 |
LIST, FORM, PROJECT DOCUMENTATION, EPCI PROJECT, PTC PLANNING AND CONTROL |
ENGINEERING NOTES AND SPECIFICATIONS
- NOTE1: INTER-AUSTENITIC SPACING SHALL BE MEASURED, AND THE RESULTS SHALL BE LESS THAN 30μm. MEASUREMENTS SHALL BE PERFORMED IN ACCORDANCE WITH THE DNVGL-RP-F112 STANDARD. THE TEST REPORT SHALL BE SENT FOR TECHNIPFMC APPROVAL.
- NOTE2: WT TOLERANCE: 0 / +12.5%
DOCUMENTS LIST
(continued...)
DOCUMENTS LIST (Continued)
DOCUMENT NUMBER |
DESCRIPTION |
RESTRICTION |
−−−−−−−−−PRODUCTION DOCUMENTS−−−−−−−− |
M40851 |
25 CR DUPLEX STAINLESS STEEL SEAMLESS PIPE, ASTM A790, BASED ON NORSOK M-630 MDS D51 REV 6, NORSOK M-650/ISO 17782 QUALIFICATION; QUALITY REQUIREMENTS INCLUDED
|
|
=================================END OF PART=================================